INJECTING SOIL STABILIZATION and REINFORCING
SYSTEM.
Problem:
Installation of building over inadequate fill system has caused 6 inches of
settlement over 10 years.
Constraints:
Building in active use during entire operation.
Solution: Excavate
down to footing height. Reinforce footing with new steel channel system.
Stabilize soil to depth of 8 feet below the building via a soil stabilization
injection liquid. Utilizing hydraulic jacking procedures, jack building
back up to original position.